Osborne Legacy Advanced
Lincoln Neb.
BEST PROJECT, SPORTS/ENTERTAINMENT, and Award of Benefit, Security
Submitted by Hausmann Development
Proprietor: College of Nebraska-Lincoln
Contractor: Hausmann Development
Lead Design Agency: BVH Structure
Structural Engineer: Hatfield Group Engineering
Civil Engineer: Olsson Inc.
MEP Engineer: M-E Engineers
Architect: Populous
Proprietor’s Consultant: Rainwood Growth Companions LLC
Spanning 315,000 sq ft, this $125-million enlargement of historic Memorial Stadium has introduced new life to the College of Nebraska’s soccer program and its student-athlete services by means of a three-year, two-phase building effort that balanced modernization with preservation.
The venture united a brand new soccer efficiency middle and complete student-athlete facilities below one roof. The primary part added athletic medication, power and conditioning areas, locker rooms, assembly rooms and soccer places of work.
The second part delivered an instructional middle, a full-service eating corridor and an expertise foyer for guests and recruits.
Constructed on a decent, occupied web site, the venture required that work proceed round energetic recreation days whereas defending the college’s iconic “Kissing Columns,” which have been relocated to kind a brand new entrance to the stadium.
The development workforce confronted a spread of challenges, together with unmapped utilities, hazardous coal-contaminated soil, buried railroad particles and greater than 5,000 design clashes—every resolved by means of 3D modeling and constructing info modeling (BIM) instruments that saved roughly $500,000 and months of delays.

Photograph by Matt Kocourek Pictures
Sustaining stadium operations throughout three soccer seasons demanded shut coordination with college employees, hearth marshals and occasion personnel.
When a key stadium gate was blocked, crews constructed a 30-ft-tall scaffold egress tower with ADA-compliant ramps to protect crowd entry. As well as, weekly “recreation day readiness” walks ensured security and code compliance.
With greater than 1.2 million work hours logged and a peak workforce of over 200 tradespeople, the contractor applied enhanced security measures past normal protocols, together with pre-event inspections and steady public-safety monitoring. Regardless of shifting management and materials delays, the venture stayed on schedule.
In a proactive transfer, the contractor resequenced building to complete the soccer locker room six months early—aligning with the season begin and demonstrating the teamwork that outlined the stadium’s newest transformation.
Trending Merchandise
KAFAHOM Power Tool Organizer Wall Mount, 4-Tier Drill Holder for Cordless Tools, 2-Pack Set, Garage Storage Rack with Side Hooks for Hammers & Pliers, Tool Organizer for Workshop/Utility Room
XMJY 5 Pack Funny Hardhat Stickers – Can We Fix It? No, It’s Fucked, Cute Cartoon Hard Hat Stickers for Builder, Waterproof Vinyl Stickers for Tool Box, Helmet (3 inch)
Cisily Brown Sponge Holder for Kitchen Sink, Sink Caddy Organizer with High Brush Holder, Kitchen Countertop Organizers and Storage Essentials, Rustproof 304 Stainless Steel, Soap Dispenser Organize
Mohawk Fil-Stik Wax Putty Stick, White M230-0202, 1 Count