Your Trusted Destination for Premium Tools, Kits, and Equipment – Designed for Every Project, Big or Small

Connecticut DOT Plans Makeover for Glastonbury Interchange

A difficult interchange in Glastonbury, Conn., is ready for enchancment with a roundabout beneath a two-year, $14.5-million Connecticut Dept. of Transportation undertaking to start inside a month. 

Plans name for the roundabout to assist untangle the complicated intersection of New London Turnpike and the southbound ramps of Route 17 close to Douglas Street. The present exit ramp terminus on the turnpike in shut proximity to Oak Avenue ends in a five-cornered intersection that has lengthy posed operational and security considerations as visitors volumes have elevated. As a part of the undertaking, two ageing bridge constructions will likely be eliminated together with the at-grade portion of the Route 17 off-ramp.

The state DOT has chosen Terryville, Conn.-based Richards Corp. as undertaking contractor, with STV Inc., tapped to offer development engineering and inspection providers.

In accordance with a 2022 company scoping examine, the interchange bridge carrying Route 17 northbound lanes over a southbound exit ramp construction spanning New London Turnpike was discovered to be “functionally out of date because of the present minimal vertical clearance being lower than present [state DOT] design standards for an present bridge over a freeway.” 

The bridge deck was additionally rated in poor situation, with 30% deterioration, massive areas of map cracking and hole sounding concrete on its. Abutment cracks and areas of peeling paint have been additionally discovered.

Following elimination of the bridge and exit ramp construction, a brand new roadway for northbound Route 17 will likely be constructed atop fill, with the brand new roundabout integrated into the brand new visitors sample. The roundabout will characteristic a particular 20-ft stamped asphalt apron together with extra pedestrian security parts fastidiously built-in into the design. The roundabout may even assist deliberate pedestrian enhancements within the space.

Different undertaking aspects embrace 400 ft of lane widening alongside Oak Avenue and alternative of all visitors indicators within the undertaking space with video and radar detection programs added to new span poles.

Trending Merchandise

0
Add to compare
0
Add to compare
0
Add to compare
- 20% Mohawk Fil-Stik Wax Putty Stick, White ‎M230-0202, 1 Count
Original price was: $8.76.Current price is: $7.00.

Mohawk Fil-Stik Wax Putty Stick, White ‎M230-0202, 1 Count

0
Add to compare
0
Add to compare
- 31% Lift Safety DAX FIFTY/50 Desert CAMO Full Brim Hard HAT
Original price was: $139.65.Current price is: $96.99.

Lift Safety DAX FIFTY/50 Desert CAMO Full Brim Hard HAT

0
Add to compare
.

We will be happy to hear your thoughts

Leave a reply

DIYToolsMart
Logo
Register New Account
Compare items
  • Total (0)
Compare
0
Shopping cart