Briefly:
- To trace a number of development bids, use a centralized system that provides each bid a standing, a deadline, an proprietor, and a doc residence in a single place.
- Most contractors lose monitor of bids as a result of they depend on electronic mail, spreadsheets, and shared drives as an alternative of a centralized system.
- A very good bid monitoring system has 4 parts: a pipeline view, doc management, deadline monitoring, and a communication log.
- A repeatable intake-to-follow-up workflow issues greater than any single instrument.
- Devoted bid administration software program scales together with your pipeline in methods spreadsheets by no means will.
- The most important errors, like skipping go/no-go filters, lacking addenda, and failing to observe up, are all course of issues with course of fixes.
Why Do Contractors Wrestle to Monitor A number of Bids?
Most estimators aren’t managing one or two bids. They’re juggling a dozen at a time, every with its personal deadline, doc set, subcontractor listing, and scope.
The issue is not capability. It is the instruments.
When bid monitoring lives throughout inboxes, shared drives, and spreadsheets, issues fall by means of the cracks. This is what that often appears to be like like:
- Scattered paperwork. Plans, specs, and addenda dwell in other places. The flawed model will get used. Prices go up.
- Missed deadlines. With no centralized calendar, bid due dates get buried in electronic mail noise.
- No single supply of fact. Three estimators, three completely different concepts of the place a undertaking stands.
- Zero communication historical past. No document of which common contractors (GCs) have been contacted, what was despatched, or what they mentioned again.
The price of getting this flawed is actual. A missed bid is misplaced income. A late submission is a disqualification. A bid constructed on the flawed plan set can tank your margin earlier than the undertaking even begins.
What Does a Good Bid Monitoring System Look Like?
A bid monitoring system is a centralized workflow that captures each lively alternative, its standing, key paperwork, and submission deadlines in a single place.
A robust system covers 4 issues:
- Pipeline view. See each lively bid without delay, together with standing, deadline, and who owns it.
- Doc management. Plans, specs, and addenda are organized and version-controlled in a single place.
- Deadline monitoring. A calendar that surfaces what’s due, what’s in danger, and what wants follow-up.
- Communication log. Each message despatched to a GC or sub is tied to the fitting undertaking.
This is how handbook monitoring compares to a software-based strategy:
| Guide (Spreadsheets and E mail) | Software program-Based mostly Monitoring | |
|---|---|---|
| Pace | Gradual; fixed knowledge entry and file searching; | Quick; automated updates and centralized entry |
| Error Price | Excessive; model management is difficult to implement | Low; doc viewer tracks the present set routinely |
| Scalability | Breaks down as bid quantity grows | Scales together with your pipeline |
| Workforce Visibility | Restricted; every particular person has their very own view | Shared; everybody sees the identical undertaking standing |
In case your bid quantity is rising and you are still monitoring manually, that is not a niche in your course of. It is the method its`elf holding you again.
How Do You Manage A number of Bids on the Identical Time?
A repeatable course of issues greater than any single instrument. Comply with this workflow on each bid, and issues cease slipping:
- Consumption. Log the brand new alternative in your bid administration system. Seize the undertaking title, proprietor, location, bid date, and undertaking sort.
- Assign. Designate an estimator or undertaking lead. Everybody must know who owns what.
- Monitor. Connect all paperwork to the undertaking document. Set deadline reminders. Replace the standing because the bid progresses.
- Submit. Affirm submission necessities (portal, electronic mail, onerous copy) and doc that the bid went out.
- Comply with up. After submission, log your outreach to the GC. Monitor whether or not you obtained a response, have been shortlisted, or misplaced.
Tip: A easy color-coded standing system retains your complete staff on the identical web page:
- Pink — Deadline inside 48 hours or speedy motion required
- Yellow — In progress; examine for addenda or lacking responses
- Inexperienced — On monitor; no motion wanted proper now
Begin with this in a spreadsheet if that is what you’ve. Simply know that when your bid quantity picks up, software program makes this quite a bit much less handbook.
What Software program Helps Contractors Monitor Development Bids?
A number of platforms are constructed particularly to prepare bid pipelines. Essentially the most extensively used choices:
| Platform | Greatest For | Core Strengths |
|---|---|---|
| ConstructConnect® | GCs and subs | Bid invites, doc management, deadline monitoring, and undertaking discovery in a single platform |
| BuildingConnected® | GCs | Bid board, subcontractor community, prequalification |
| Procore® | Bigger GC groups | Full undertaking lifecycle administration, robust integrations |
Selecting primarily based in your position:
- Common contractors want instruments that assist them ship skilled invites to bid (ITBs), monitor subcontractor protection by commerce, and monitor bid intent earlier than bid day.
- Subcontractors want instruments that floor related alternatives early, preserve paperwork organized, and make it simple to answer GC invites with out juggling a number of logins.
How ConstructConnect Handles Bid Monitoring
ConstructConnect places bid invites, doc entry, and deadline monitoring in a single place. Estimators spend much less time attempting to find recordsdata and extra time placing collectively aggressive numbers.
What that covers in observe:
- Bid Center provides subs a pipeline view of each lively alternative, with undertaking standing, bid dates, and doc entry multi function spot.
- Bid Management helps GCs create and ship branded ITBs, set trade-level bid response targets, monitor engagement, and catch protection gaps earlier than bid day.
- Doc Viewer centralizes plans, specs, and addenda so your staff at all times works off the present set.
- Deadline monitoring reveals what’s due, what’s in danger, and who hasn’t responded but.
The Wesson Group, an infrastructure contractor in New York, changed their Excel-based monitoring with ConstructConnect Bid Administration. Between 2019 and 2021, the corporate grew income from $36M to $80M, and credited extra environment friendly bid workflows as a part of how they acquired there.
Building Crafts saved roughly 20 hours per week and $500 to $1,000 per bid after centralizing their bid communications and reducing the handbook admin that had been slowing their staff down.
What Are the Most Widespread Bid Monitoring Errors?
Even skilled estimating groups run into the identical points. Look ahead to these:
- Bidding and not using a go/no-go filter. Not each undertaking deserves your time. Unfold your estimating capability throughout too many lengthy pictures, and you may miss those you may truly win. Construct a easy scoring system: undertaking sort, relationship with the GC, present bid quantity, and practical probability of award.
- Not logging communication with GCs. If it isn’t in your system, it did not occur. Log each outreach, each response, and each follow-up tied to the particular undertaking.
- Lacking addenda updates. One revised plan set can change your complete quantity. That is not a threat you’ll be able to handle manually at scale. In case your system would not flag doc modifications routinely, you are guessing.
- Failing to observe up after submission. Most contractors submit and transfer on to the following one. The groups with stronger win charges observe up constantly, monitor the end result, and use that knowledge to get smarter about what they chase.
See How ConstructConnect Centralizes Your Bid Pipeline
Monitoring a number of bids would not should imply extra hours. It means a greater system.
See how ConstructConnect centralizes your bid pipeline →
Continuously Requested Questions (FAQs)
What number of bids ought to a contractor monitor without delay?
There is no single proper reply. It depends upon your staff measurement, undertaking varieties, and estimating capability. A solo estimator can often handle 5 to 10 lively bids. A staff with devoted preconstruction workers can deal with extra. What issues is having a system that provides you visibility throughout all of them, so nothing will get dropped.
What’s one of the best free instrument for monitoring development bids?
A well-structured spreadsheet with columns for undertaking title, bid date, standing, assigned estimator, doc hyperlink, and follow-up notes is a strong place to start out. Free tiers on platforms like ConstructConnect also can assist subs obtain and reply to ITBs. Free instruments maintain up effectively whenever you’re monitoring fewer than 10 to fifteen lively bids. Previous that, the handbook maintenance tends to turn out to be its personal downside.
How do I do know when a bid deadline has modified?
Modifications often come by means of addenda or direct communication from the GC. If you happen to’re monitoring manually, it’s a must to catch these your self. Platforms like ConstructConnect push notifications routinely when undertaking paperwork or bid dates are up to date.
What ought to a bid monitoring spreadsheet embody?
At minimal:
- Challenge title and quantity
- Proprietor and common contractor
- Bid due date
- Assigned estimator
- Present standing (monitoring, bidding, submitted, gained, misplaced)
- Doc hyperlink or location
- Final communication date
- Comply with-up notes
When you’re managing greater than 10 to fifteen bids at a time, a devoted platform will prevent extra time than sustaining this manually.
How do I observe up on a submitted bid?
Wait 3 to five enterprise days after the bid date, then attain out to the GC straight. Preserve it temporary: verify receipt, categorical continued curiosity, and ask in the event that they want the rest from you. Log the outreach. If you happen to do not hear again in two weeks, observe up once more. Most contractors skip this totally, so doing it constantly already places you forward.
Trending Merchandise
KAFAHOM Power Tool Organizer Wall Mount, 4-Tier Drill Holder for Cordless Tools, 2-Pack Set, Garage Storage Rack with Side Hooks for Hammers & Pliers, Tool Organizer for Workshop/Utility Room
XMJY 5 Pack Funny Hardhat Stickers – Can We Fix It? No, It’s Fucked, Cute Cartoon Hard Hat Stickers for Builder, Waterproof Vinyl Stickers for Tool Box, Helmet (3 inch)
Cisily Brown Sponge Holder for Kitchen Sink, Sink Caddy Organizer with High Brush Holder, Kitchen Countertop Organizers and Storage Essentials, Rustproof 304 Stainless Steel, Soap Dispenser Organize
Mohawk Fil-Stik Wax Putty Stick, White M230-0202, 1 Count